Home > Products > Stone Coated Roof Production Line > Stone Coated Metal Roofing Tile Machine

Stone Coated Metal Roofing Tile Machine

Basic Info

Model No.ZT-005-17

BrandZHONGTUO

Additional Info

Packagingas customer requirem

Productivity600 pieces an hour

TransportationOcean,Land

Place of OriginChina

Supply Ability5 set/3 month

CertificateCE, ISO9001

Payment TypeT/T,L/C,D/A,D/P,Western Union

IncotermFOB

Product Description

Stone Coated Metal Roofing Tile Machine

Stone Coated Metal Roofing Tile is a modern environmentally friendly roofing material .Covering color vermiculite surface which carried under the high temperature Technology. It is high-performance, stable, energy-efficient and easy operation.

Stone Coated Metal Roofing Tile Machine has three parts: slitting and cutting part to make the suitable plate; roof tile pressure machine;stone coated machine.Those parts combine a complete production line.

A sample profile drawing:

Stone Coated Roof Production Line


Component and production process of Stone Coated Roofing Production Line

Decoile ---slitting and cutting part--- 200T Press profile machine---Lace Shearing Machine---Stone coated machine(Auto bottom glue spraying section---Auto stone coated section---The first time drying section---Auto face glue spraying section---The second time drying section---Mixer of sand)


The main parameters of Stone Coated Roofing Production Line

Main raw material : 0.4mm aluminum plate,or as customer requirement.

Normal feeder width:914mm (change by profile)

Material of mold: D2/GCr12MoVo

Slitting speed:10m/min

Total power: 250kw

Productivity: 3-6m/min Calculate as 1.2m per piece, eight hours,

produce 1500pcs every day

Machine weight: 35T

Production condition: need plant area 2000 square meter(25m*80m)

the type of rool tile we can do:

Shingle

Classic

Roman


Production pictures for you reference:

1. slitting and cutting line

slitting and cutting pline

2.200T Press profile machine

pressure machine

3.-Lace shearing machine

Lace Shearing Machine

4.Auto bottom glue spraying section

 Auto bottom glue spraying section

5.-Auto stone coated section

Stone Coated Roof Production Line

6.drying section

Stone Coated Roof Production Line

drying section1


Payment: 30% T/T in advance and balance 70% after inspection confirmation before shipment.

Delivery time : 90 days

Container need: two 40 GP and one 40 HQ

1. One year, and we will provide the technical support for the whole life.

2. Training: the buyer should charge of visa, return ticket, food and accommodation overseas and USD50/person/day for salary.

3. Need one technician.

4. Training time: one week (contains the time of installation and adjustment)


The video of Stone Coated Roof Production Line:

1. roof tile making mchine:


2. stone coated machine



Product Categories : Stone Coated Roof Production Line

Product Images

  • Stone Coated Metal Roofing Tile Machine
  • Stone Coated Metal Roofing Tile Machine
  • Stone Coated Metal Roofing Tile Machine
  • Stone Coated Metal Roofing Tile Machine
  • Stone Coated Metal Roofing Tile Machine
Email to this supplier
  • *Subject:
  • *Messages:
    Your message must be between 20-8000 characters