Brand: ZHONGTUO
Packaging: as customer requirem
Productivity: 600 pieces an hour
Place of Origin: China
Supply Ability: 5 set/3 month
Certificate: CE, ISO9001
Incoterm: FOB
We developed Colorful Vermiculite Roof Tile Production Line based on long time running and improvement. It is high-performance,stable, energy-efficient and easy operation.
Colorful Vermiculite Roof Tile Production Line is including five main parts:
1. Auto bottom glue spraying section
2.Auto stone coated section
3 .The first time drying section
4 .Auto face glue spraying section
5. The second time drying section
1.Outside Dimension:800*1350*850mm(L*W*H)
2.Structure:Channel steel ,weldedTransmission:2.2 kw Variable-frequency adjustable-speed motor 0-32R/Min
3.Conveying device: Reciprocating chain conveys
4.Automatic glue spraying assembly with motor:0.06kw
5.Adsorption of dust removal equipment:1 set
6.Air compressor:1 set 0.09m³
7.Airless spray glue pump:1 set
8.Automatic glue spraying gun:1 piece
9.Fill glue gun: 1 piece
1.Outside Dimension :3000*1850*700mm(L*W*H) Structure:Channel steel ,angle steel ,welded
2.Transmission:With glue spraying equipment compound chain transmit
3.Conveying device:Compound chain transmit
4.Automatic sand hopper:1 set (dimension 550*600*500mm)
5.Automatic rising machine:1 set(Rising height:1.9m Power:300kg/h)
1.Outside Dimension :25000*800*1200mm(L*W*H)
2.Structure:carbon steel welded Frame type heat preservation ,wall:fill up with heat preservation material which is bended with 1mm carbon steel
3.Automatic temperature controller:2 sets,Range of adjustable temperature:0-160°
4.Infrared fluorescent tube:50 pcs
5.Conveying device: Reciprocating chain conveys
6.Cool device:1 set
Payment: 30% T/T in advance and balance 70% after inspection confirmation before shipment.
Delivery time : 90 days
Container need: two 40 GP and one 40 HQ
1. One year, and we will provide the technical support for the whole life.
2. Training: the buyer should charge of visa, return ticket, food and accommodation overseas and USD50/person/day for salary.
3. Need one technician.
4. Training time: one week (contains the time of installation and adjustment)
The video of Stone Coated Roof Production Line:
1. roof tile making mchine:
2. stone coated machine
Product Categories : Stone Coated Roof Production Line